|
| Tape Libray and tap usage |
 |
Thu, 10 Apr 2008 14:21:01 -070 |
We have a Dell ML6020 with three IBM drives and an 82 slot library. DPM uses
one tape per group per day (we perform daily tape backups to tape) even if
the backup is only 25% of the available tape storage.
Is there a way to make a tape libary use a tape for multiple backups until
it has become full. This can be for the same group over mulitple jobs (days)
or several groups it doesn't matter either way. I just want to take
advantage of the available 400 GBs on the tape.
--
|
| Post Reply
|
| Re: Tape Libray and tap usage |
 |
Fri, 11 Apr 2008 22:13:56 +053 |
Thanks for your feedback.
Right now there is no way to achive this.
DPM team is considering this improvement for the SP1.
Thanks,
Niraj Kalamkar [MSFT]
This posting is provided "AS IS" with no warranties, and confers no
rights
"Mark" <Mark@discussions.microsoft.com> wrote in message
news:982294E6-4766-43C5-B77F-0538ECDF0C0E@microsoft.com...
> We have a Dell ML6020 with three IBM drives and an 82 slot library. DPM
> uses
> one tape per group per day (we perform daily tape backups to tape) even if
> the backup is only 25% of the available tape storage.
>
> Is there a way to make a tape libary use a tape for multiple backups until
> it has become full. This can be for the same group over mulitple jobs
> (days)
> or several groups it doesn't matter either way. I just want to take
> advantage of the available 400 GBs on the tape.
> --
> Mark F
|
| Post Reply
|
|
|
|
|
|
|
|
|
|