|
| SS 2005 has just overwritten checked out stuff on recursive Get Latest Version |
 |
Wed, 8 Aug 2007 19:37:47 +0100 |
For SS 6.01d, it was such that if I did "Get Latest Version" recursive
for a
big suite of projects, if would _ONLY_ get the latest changes teammates had
checked in.
What it would not do if overwrite stuff I have checked out.
How do I configure SS2005 to do the same?
Thanks
Stephen Howe
|
| Post Reply
|
|
|
|
|
|
|
|
|
|